Set Up Huginn
BTM-6 Order: #6 Elaboration Has Dependencies
Updated 1 month, 2 weeks ago
Guidance
Objective
Configure Huginn to execute the AIN assessment contract manually and, when appropriate, on a schedule. Huginn observes and reports; it does not redefine Charter variables or bypass delivery gates.
Required inputs
- Approved Charter v0 at
docs/project/CHARTER.md. - A runnable repository with its delivery/test commands.
- Completed Inception and Elaboration readiness evidence.
- A selected GH or Jira ticket adapter and credentials supplied through the project's approved secret mechanism.
Procedure
- Inspect existing Huginn configuration and repository automation before creating anything.
- Create
docs/project/HUGINN_ASSESSMENT_CONTRACT.mdcontaining:
- repository and environment identity;
- manual trigger and schedule;
- exact source/query/command for every Charter variable;
- assessment snapshot boundary and freshness limit;
- ticket system, project/repository, labels/types, and stable concern key;
- expected-artifact paths and staleness checks;
- notification and escalation destinations;
- retry, timeout, and overlapping-run policy. - Configure one AIN run at a time per project. A second trigger must reuse or wait for the active run, not race it.
- Run AIN once manually against known data.
- Verify the persisted Assessment Run Record, ticket action, throughput result, coverage result, and final report.
- Enable scheduling only after the manual run passes.
Failure handling
If a source, credential, query, or ticket adapter is missing, record the exact blocker and stop. Never substitute invented data or mark an unmeasurable variable Green.
Completion evidence
The contract is committed, a manual run has a stable run ID and complete report, all side effects are idempotent, and the next scheduled time is visible when scheduling is enabled.
Details
- Order:
- #6
- Phase:
- Predecessor:
- BTM-5 Complete Inception and Elaboration
- Successor:
- BTM-7 Run First Iteration, Ship Increment
- Created:
- Sep 21, 2026
- Last Updated:
- Sep 21, 2026
Workflow
Bootstrap the Team
Applicability gate: count the people actively participating in the project before starting BTM. One or two people is a solo …
View WorkflowAssigned Agent
Delivery Manager (DM)
Single merged PM/DM role. Staffed at Kickoff. Owns the Charter, is the recipient of all …
Required Skills
No skills linked
Rules
No rules linked.
Input Artifacts 3
-
Delivery Management Assignment
Document
Required
Produced by: Assign the Delivery Manager -
Elaboration Readiness Record
Document
Required
Produced by: Complete Inception and Elaboration -
Project Charter
Document
Required
Produced by: Draft Charter v0
Output Artifacts 1
- Huginn Assessment Contract Document Required