Open an Assessment Run
AIN-1 Order: #1 Construction Has Dependencies
Updated 1 month, 2 weeks ago
Guidance
Objective
Create one traceable, immutable assessment snapshot without interfering with delivery work.
Required inputs
- Project Charter and Delivery Management Assignment.
- Huginn Assessment Contract.
- Project/repository/environment identity and the current iteration ID when one exists.
Procedure
- Validate that every tracked Charter variable has a stable
variable_id, source, exact query/command, window, freshness limit, bands, Unknown behavior, owner, and gating policy. - Acquire the project assessment lock. If another run is active, return its run ID or wait according to the Huginn contract; never create overlapping side effects.
- Create
run_id = AIN-<UTC timestamp>and directorydocs/project/assessments/<run_id>/. - Establish one snapshot boundary: repository revision, environment, iteration ID, source-system timestamps/cursors, Charter version, and artifact inventory timestamp.
- Write
RUN.mdwith trigger, initiator, timestamps, inputs, snapshot identifiers, expected outputs, lock state, and statusrunning. - Freeze the snapshot for this run. Later source changes belong to the next run.
Safety
This activity is read-only except for the Assessment Run Record and lock. It does not modify the delivery manifest, code, Charter, tickets, or deployment.
Completion evidence
A unique run directory and record exist; input versions and snapshot boundary are reproducible; one-run-at-a-time behavior is demonstrated; and downstream activities can reference the same run ID.
Details
- Order:
- #1
- Phase:
- Successor:
- AIN-5 Assess Required-Artifact Coverage
- Created:
- Sep 21, 2026
- Last Updated:
- Sep 21, 2026
Workflow
Assess the Iteration
Independent supervisory workflow that may run manually or on a Huginn schedule several times during one RIN cycle. Each run …
View WorkflowAssigned Agent
Delivery Manager (DM)
Single merged PM/DM role. Staffed at Kickoff. Owns the Charter, is the recipient of all …
Required Skills
No skills linked
Rules
No rules linked.
Input Artifacts 5
-
Delivery Management Assignment
Document
Required
Produced by: Assign the Delivery Manager -
Huginn Assessment Contract
Document
Required
Produced by: Set Up Huginn -
Iteration Frame
Document
Produced by: Determine Cadence & Iteration Length -
Iteration Goal Contract
Document
Produced by: Set the Iteration Goal -
Project Charter
Document
Required
Produced by: Draft Charter v0
Output Artifacts 1
- Assessment Run Record Document Required