Objective
Ship a test feature through the entire pipeline: code change → CI (test, build) → CD (deploy idle, smoke, approve, switch) → verify production. This is the acceptance gate for the DCD workflow.
Process
1. Prepare a Test Feature
Make a visible change to verify the full pipeline:
# Add a version endpoint
# e.g., GET /version returns {"version": "0.1.0", "commit": "{sha}"}
Write tests for it:
# Add test
git add .
git commit -m "feat: add /version endpoint for pipeline verification"
2. Push and Watch CI
git push origin main
Monitor GitHub Actions → CI workflow:
- ✅ make provision — dependencies installed
- ✅ make lint — no warnings
- ✅ make test — all tests pass
- ✅ make test-integration — all pass
- ✅ make containers — image pushed to ECR
Verify image in ECR:
aws ecr describe-images --repository-name {project} \
--query 'imageDetails | sort_by(@, &imagePushedAt) | [-1].imageTags' --output text
3. Watch CD Pipeline
CD triggers automatically after CI succeeds:
- ✅ deploy-idle —
make deploy ENV=idle→ pods running in idle namespace - ✅ smoke-test —
make smoke-test ENV=idle→ smoke tests pass
Verify idle deployment:
kubectl get pods -n {idle-namespace}
curl https://idle.{domain}/version
# Should show new version
4. Approve Switch
In GitHub Actions → CD workflow:
- The switch job is waiting for approval
- Review the smoke test results
- Approve in the production environment
5. Verify Production
After approval:
- ✅ make switch — DNS weights swapped
- ✅ make smoke-test ENV=prod — production smoke tests pass
curl https://prod.{domain}/version
# Should show new version with current commit SHA
6. Test Rollback
# Trigger rollback via GH Actions or CLI
make rollback
# Verify prod reverted
curl https://prod.{domain}/version
# Should show previous version
# Switch back (re-apply the new version)
make switch
curl https://prod.{domain}/version
# Should show new version again
7. Create Verification Checklist
Document in docs/architecture/CICD_VERIFICATION.md:
# CI/CD Verification
## Pipeline Summary
| Step | Status | Duration | Notes |
|------|--------|----------|-------|
| CI: provision | ✅ | ~2 min | Dependencies cached |
| CI: lint | ✅ | ~30 sec | Zero warnings |
| CI: test | ✅ | ~1 min | All pass |
| CI: test-integration | ✅ | ~2 min | All pass |
| CI: containers | ✅ | ~3 min | Image: {sha} |
| CD: deploy-idle | ✅ | ~2 min | Pods healthy |
| CD: smoke-test | ✅ | ~1 min | All pass |
| CD: approval | ✅ | Manual | Approved by {user} |
| CD: switch | ✅ | ~60 sec | DNS propagated |
| CD: verify-prod | ✅ | ~1 min | All pass |
| Rollback | ✅ | ~60 sec | DNS reverted |
## Total Pipeline Time
- CI: ~8 min
- CD (auto): ~5 min
- CD (manual): depends on reviewer
- Rollback: ~60 sec
## Make Targets Verified
| Target | Works Locally | Works in CI/CD |
|--------|--------------|----------------|
| make provision | ✅ | ✅ |
| make lint | ✅ | ✅ |
| make test | ✅ | ✅ |
| make containers | ✅ | ✅ |
| make deploy ENV=... | ✅ | ✅ |
| make smoke-test ENV=... | ✅ | ✅ |
| make switch | ✅ | ✅ |
| make rollback | ✅ | ✅ |
| make pipeline-status | ✅ | ✅ |
8. Commit
git add docs/architecture/CICD_VERIFICATION.md
git commit -m "docs: add CI/CD verification checklist — pipeline fully operational"
Deliverables
- ✅ Test feature shipped through full pipeline
- ✅ CI pipeline — test → build → push verified
- ✅ CD pipeline — deploy idle → smoke → approve → switch verified
- ✅ Rollback tested and verified
- ✅
docs/architecture/CICD_VERIFICATION.md— checklist documented - ✅ Local and CI/CD parity — all
maketargets work identically in both
Inputs
Read these before starting this activity. They are produced earlier in the playbook and are authoritative — raise a drift event instead of deviating.
- Helm Chart Template (Template, Optional) — produced by Create Helm Chart & Values (#82).
- CI Pipeline (GitHub Actions) (Code, Required) — produced by Build CI Pipeline (#84).
- CD Pipeline (GitHub Actions) (Code, Required) — produced by Build CD Pipeline (#85).
Details
- Order:
- #7
- Phase:
- Predecessor:
- DCD-6 Implement Switch & Rollback
- Created:
- Apr 12, 2026
- Last Updated:
- May 21, 2026
Workflow
Design & Deploy CICD
Design and deploy CI/CD pipeline using GitHub Actions in the application monorepo. Create Helm chart with per-environment values, add container …
View WorkflowAssigned Agent
No agent assigned
Required Skills
- GitHub Actions Patterns CI_CD GitHub Actions
Rules
No rules linked.
Input Artifacts 3
-
CD Pipeline (GitHub Actions)
Document
Required
Produced by: Build CD Pipeline -
CI Pipeline (GitHub Actions)
Document
Required
Produced by: Build CI Pipeline -
Helm Chart Template
Template
Produced by: Create Helm Chart & Values
Output Artifacts
No output artifacts